Energy certificates

Commercial EPCs

EPCs for offices, shops, industrial buildings and other commercial properties across Scotland. We survey the building, model its energy performance and lodge the certificate.

Turnaround
48 hours
Starting fee
From £170 + VAT
Coverage
Scotland & north of England

Starting price for standard assessments, excluding VAT. We confirm the full fee before work begins.

Entrance to St Enoch Centre in Glasgow
48hrs From site visit to finished report

What you get

What’s included

  • On-site non-domestic assessment
  • Accredited EPC lodgement and certificate issue
  • Practical improvement recommendations
  • Non-domestic site assessment
  • Certificate and recommendations
  • Single properties and portfolios

How it works

From enquiry to report in four simple steps.

  1. 01

    Tell us about the property

    Send the address, building use and any drawings or existing reports through our quote form.

  2. 02

    Fixed quote, agreed upfront

    We confirm the scope and full fee before any work begins, so there are no surprises.

  3. 03

    We visit the site

    An assessor attends at a time that suits you and gathers everything needed on the day.

  4. 04

    Report in 48 hours

    Your report is issued within 48 hours of the site visit.

Planning your assessment

Your questions, answered.

Straightforward guidance on what’s required, what we look at and what to send us.

Last reviewed against the official and technical sources listed.

What is a commercial EPC?

A commercial EPC, also called a non-domestic EPC, describes the building’s energy performance using standardised assumptions about use. It is an asset rating rather than a record of the occupier’s bills. The accompanying recommendations identify potential improvements, subject to their suitability for the property.

When do I need an EPC in Scotland?

An EPC is normally required when an applicable building is constructed, sold or let to a new tenant. Owners arranging a sale or letting should establish the EPC position before marketing and make the required information available to prospective buyers or tenants. The Scottish Government’s requirements guidance explains the duties and advertising rules.

How long is a commercial EPC valid?

Under the current Scottish system, an EPC can be valid for up to ten years. Check the certificate and register record, and do not assume an old certificate represents a substantially altered building. The Scottish Government’s latest reform update says the current system remains until spring 2028; future certificates and transitional rules should not be confused with today’s requirements. Check the linked reform update for a transaction affected by the changeover.

What buildings are exempt?

Exceptions exist, including some temporary buildings, stand-alone buildings under 50 m² and certain low-energy-demand industrial or agricultural premises. Conditions apply to each category. Do not assume that every listed building, empty unit or unheated property is exempt; provide its actual use and services information for a scope review.

What does the assessor inspect?

The assessment records geometry, construction, openings, insulation evidence, heating, cooling, hot water, ventilation, lighting and controls relevant to the energy model. Access is needed to representative spaces and building services. Plans and dated specifications help establish details that cannot be confirmed by inspection alone.

What affects the rating and what can I improve?

The model reflects fabric performance and building services, including system efficiencies and controls. Missing evidence may restrict which performance values can be used. Reviewing the recommendations alongside maintenance plans can help identify suitable upgrades; no particular rating or saving can be promised before the assessment.

What do I receive and how long does it take?

The agreed scope includes the assessment, EPC lodgement and recommendation report. SES aims to issue the EPC within 48 hours of the site visit, subject to access, complexity and complete information. Confirm the programme before relying on it for a sale or lease deadline.

What is the Scottish EPC Register?

It is the register used to find Scottish EPC records and registered assessors. Check for an existing certificate before ordering a replacement, and keep the lodged document with the property records. Qualifying larger buildings may also need a Section 63 Action Plan.

Can you cover Glasgow, Edinburgh and multi-site instructions?

SES is based at 272 Bath St, Glasgow, G2 4JR. Send the addresses, areas and access contacts for sites in Glasgow, Edinburgh, the Central Belt or elsewhere in Scotland. We can scope a single instruction or a portfolio programme; coverage outside Scotland is confirmed against the service and location.

What information should I send?

  • Property address, use, approximate floor area and sale or letting deadline
  • Floor plans, existing EPC and evidence of previous alterations
  • Heating, cooling, ventilation, lighting and hot-water specifications
  • Access contacts, occupied areas and any shared plant or landlord services

Send what you have through our quote form or contact us for advice.

Sources and guidance

Requirements depend on the property, proposed work and relevant dates. The sources below distinguish statutory guidance from assessment methodology; SES provides assessment services, not regulatory approval.

Ready to book your assessment?

Send the location, plans and deadline. We’ll confirm a fixed fee, and you’ll have your report within 48 hours of our visit.