Design & modelling
SAP calculations
SAP calculations for residential projects across Scotland. We assess the design, advise on changes and update the calculations at completion.
- Turnaround
- 48 hours
- Starting fee
- From £200 + VAT
- Coverage
- Scotland & north of England
Starting price for standard assessments, excluding VAT. We confirm the full fee before work begins.
What you get
What’s included
- Design-stage SAP calculations
- As-built SAP updates and final outputs
- Technical coordination with project teams
- Scottish domestic energy standards
- Design and as-built calculations
- Architect and developer coordination
How it works
From enquiry to report in four simple steps.
- 01
Tell us about the property
Send the address, building use and any drawings or existing reports through our quote form.
- 02
Fixed quote, agreed upfront
We confirm the scope and full fee before any work begins, so there are no surprises.
- 03
We review your information
We check your drawings and specification and flag anything missing straight away.
- 04
Report in 48 hours
Results are issued within 48 hours of receiving complete information.
Planning your assessment
Your questions, answered.
Straightforward guidance on what’s required, what we look at and what to send us.
Last reviewed against the official and technical sources listed.
What are SAP calculations?
SAP is the Standard Assessment Procedure for the Energy Rating of Dwellings. It evaluates dwelling energy performance from geometry, fabric and services information. It is a calculation method used for residential assessment, whereas SBEM addresses non-domestic buildings.
When is SAP required?
New dwellings normally need calculations demonstrating the applicable Scottish domestic energy standards. For a conversion or extension, the evidence route depends on the work and the relevant handbook provisions; not every alteration needs the same full-dwelling calculation. Confirm the scope with the design team and verifier.
How do Scottish Building Standards affect the assessment?
Scottish projects should use the applicable Section 6 guidance and approved software for their warrant date, rather than assuming England’s Part L applies. The domestic handbook for warrants from 6 April 2026 is linked below. Older warrants may need an earlier edition and its transitional arrangements.
What is the difference between design and as-built SAP?
Design-stage calculations test the proposed construction before key specifications are fixed. As-built calculations are updated to reflect installed products, construction changes and supporting test evidence. Keeping a change record helps avoid late discrepancies between the approved design and completion information.
Does SAP produce the final EPC?
SAP assessment information can support the new dwelling’s EPC, but a design-stage calculation alone is not the final lodged certificate. Confirm completion evidence and EPC delivery within the agreed instruction. An existing home assessment may use a different evidence process.
When should the architect commission the work?
Begin once coordinated plans and an initial specification are available. Testing insulation, glazing, heating, hot water and ventilation options at this stage is more useful than discovering a shortfall after procurement. Provide the warrant deadline and intended completion date when requesting a programme.
What information should I send?
- Dimensioned plans, elevations, sections and orientation
- Wall, roof and floor build-ups; window and door specifications
- Heating, hot-water, ventilation and renewable-system details
- Thermal-bridge evidence, airtightness target and completion test results
- Warrant date, dwelling schedule and record of design changes
Send what you have through our quote form or contact us for advice.
Sources and guidance
Requirements depend on the property, proposed work and relevant dates. The sources below distinguish statutory guidance from assessment methodology; SES provides assessment services, not regulatory approval.
Ready to book your assessment?
Send the location, plans and deadline. We’ll confirm a fixed fee, and you’ll have your report within 48 hours of receiving complete information.