Design & modelling
Dynamic simulation modelling
Building modelling to assess energy use, comfort and overheating. We agree the scope around the questions your project needs to answer.
- Turnaround
- 48 hours
- Starting fee
- Tailored quote
- Coverage
- Scotland & north of England
What you get
What’s included
- Dynamic model build from project data
- Scenario testing and sensitivity analysis
- Technical outputs for team and stakeholder review
- Time-based building analysis
- Complex fabric and HVAC studies
- Documented assumptions and outputs
How it works
From enquiry to report in four simple steps.
- 01
Tell us about the property
Send the address, building use and any drawings or existing reports through our quote form.
- 02
Fixed quote, agreed upfront
We confirm the scope and full fee before any work begins, so there are no surprises.
- 03
We review your information
We check your drawings and specification and flag anything missing straight away.
- 04
Report in 48 hours
Results are issued within 48 hours of receiving complete information.
Planning your assessment
Your questions, answered.
Straightforward guidance on what’s required, what we look at and what to send us.
Last reviewed against the official and technical sources listed.
What is Dynamic Simulation Modelling?
DSM represents how a building responds over time to weather, occupancy, fabric and services. It can examine energy demand, internal temperatures and comfort under defined scenarios. Results depend on the inputs and intended use of the model; they are not a guarantee of measured performance.
How does DSM differ from SBEM?
SBEM is a simplified compliance and certification method using standard assumptions. Dynamic modelling can investigate time-dependent behaviour and complex design choices in more detail. A design simulation is not automatically an approved compliance model: the software, assessor scope and jurisdiction must match the required output.
When is detailed modelling useful?
Consider it where HVAC operation, mixed uses, large glazed areas, unusual occupancy or overheating concerns need closer investigation. Architects and engineers should commission it while there is still scope to change orientation, glazing, shading, ventilation and plant strategy.
How does DesignBuilder fit into the process?
DesignBuilder is one example of a modelling interface that uses EnergyPlus for time-based simulation, including fabric, HVAC and comfort studies. Software capabilities do not establish an assessor’s accreditation or the approval status of a particular calculation. Confirm the proposed tool and method in the project scope.
What outputs should the project team expect?
Agree the required outputs before the model is built: model assumptions, energy or temperature results, comparison of selected scenarios, limitations and recommendations for the design team. Where TM59 is the brief, reporting should identify the assessed spaces, assumptions and overheating criteria rather than merely presenting a building-wide energy total.
Can DSM support Scottish compliance?
Approved DSM routes can be used within the non-domestic calculation framework where appropriate. Scottish Section 6 requirements and England/Wales Part L routes are jurisdiction-specific. An operational-energy or comfort study should be commissioned separately from a statutory output when its assumptions differ.
What information should I send?
- Coordinated building geometry and orientation
- Fabric, glazing and shading specifications
- Occupancy, equipment gains and operating schedules
- HVAC system descriptions, ventilation and controls
- Study objective, weather assumptions, comparison options and reporting deadline
Send what you have through our quote form or contact us for advice.
Sources and guidance
Requirements depend on the property, proposed work and relevant dates. The sources below distinguish statutory guidance from assessment methodology; SES provides assessment services, not regulatory approval.
Ready to book your assessment?
Send the location, plans and deadline. We’ll confirm a fixed fee, and you’ll have your report within 48 hours of receiving complete information.