Overheating assessments (TM59)
TM59 assessments for residential projects in Scotland. We model overheating risk and test changes to glazing, shading and ventilation.
- Turnaround
- 48 hours
- Starting fee
- From £200 + VAT
- Coverage
- Scotland & north of England
Starting price for standard assessments, excluding VAT. We confirm the full fee before work begins.
What you get
What’s included
- TM59 dynamic thermal modelling
- Mitigation strategy testing
- Reporting for planning and technical coordination
- Residential thermal modelling
- Glazing, shading and ventilation review
- Clear assumptions and mitigation options
How it works
From enquiry to report in four simple steps.
- 01
Tell us about the property
Send the address, building use and any drawings or existing reports through our quote form.
- 02
Fixed quote, agreed upfront
We confirm the scope and full fee before any work begins, so there are no surprises.
- 03
We review your information
We check your drawings and specification and flag anything missing straight away.
- 04
Report in 48 hours
Results are issued within 48 hours of receiving complete information.
Planning your assessment
Your questions, answered.
Straightforward guidance on what’s required, what we look at and what to send us.
Last reviewed against the official and technical sources listed.
What is a TM59 assessment?
CIBSE TM59 provides a methodology for assessing overheating risk in homes through dynamic thermal modelling. It considers conditions in occupied rooms using defined criteria and assumptions. It is different from an EPC, which addresses energy performance rather than room-by-room summer comfort.
Is TM59 a legal requirement for every Scottish home?
No blanket claim should be made. TM59 is a technical methodology; whether it is requested depends on the applicable Scottish standards, planning conditions and project brief. England’s Part O requirements should not be presented as Scottish law. Agree the required compliance evidence with the design team and relevant authority.
What affects the assessment?
Glazing area and solar performance, orientation, shading, ventilation openings, thermal mass, occupancy and internal gains all influence results. Window opening assumptions should reflect practical restrictions such as safety, noise and security. A model based on unrealistic ventilation assumptions can mislead a design decision.
How is the modelling carried out?
The scope establishes rooms to assess, weather data, occupancy assumptions and the applicable methodology. A baseline model is tested, then agreed changes are compared. The report should describe the assumptions, results, any criteria not met and the mitigation measures assessed.
What mitigation can be tested?
Options can include adjusting glazing, adding external shading and revising the ventilation strategy. Compare feasible passive measures early with the architect and services engineer. A successful modelled option must still be incorporated into the actual design and used as assumed.
When should I arrange it?
Commission the assessment before glazing, facade and ventilation specifications are fixed. Provide the design issue date and identify constraints so mitigation testing addresses options that can actually be built. Update the model if significant design changes affect the assessed assumptions.
What information should I send?
- Plans, elevations, sections and site orientation
- Glazing g-values, frame/opening dimensions and shading geometry
- Room uses, occupancy assumptions and internal gains
- Ventilation strategy and restrictions on window opening
- Construction build-ups, design stage and the assessment brief
Send what you have through our quote form or contact us for advice.
Sources and guidance
Requirements depend on the property, proposed work and relevant dates. The sources below distinguish statutory guidance from assessment methodology; SES provides assessment services, not regulatory approval.
Ready to book your assessment?
Send the location, plans and deadline. We’ll confirm a fixed fee, and you’ll have your report within 48 hours of receiving complete information.