Energy certificates
Display Energy Certificates
Display Energy Certificates for Scottish properties using the Section 63 reporting route. We review your building and energy data to confirm the assessment scope.
- Turnaround
- 48 hours
- Starting fee
- From £200 + VAT
- Coverage
- Scotland & north of England
Starting price for standard assessments, excluding VAT. We confirm the full fee before work begins.
What you get
What’s included
- Operational energy data review
- DEC assessment and certificate scope
- Reporting and improvement advice as agreed
- Measured energy performance
- Section 63 reporting in Scotland
- Consumption and metering review
How it works
From enquiry to report in four simple steps.
- 01
Tell us about the property
Send the address, building use and any drawings or existing reports through our quote form.
- 02
Fixed quote, agreed upfront
We confirm the scope and full fee before any work begins, so there are no surprises.
- 03
We visit the site
An assessor attends at a time that suits you and gathers everything needed on the day.
- 04
Report in 48 hours
Your report is issued within 48 hours of the site visit.
Planning your assessment
Your questions, answered.
Straightforward guidance on what’s required, what we look at and what to send us.
Last reviewed against the official and technical sources listed.
What is a Display Energy Certificate?
A DEC reports operational energy performance using measured consumption, whereas an EPC is an asset assessment based on standardised use. Actual consumption is affected by occupation and management as well as the building itself, so the two ratings should not be treated as interchangeable.
When is a DEC relevant in Scotland?
Under the Section 63 process, an owner can defer identified improvements by reporting operational energy performance annually through a DEC. This is distinct from Scottish requirements to display an EPC in qualifying buildings. Do not apply England and Wales public-building DEC rules automatically to a Scottish property.
How does annual reporting work?
For the Scottish Section 63 deferral route, plan for ongoing annual reporting rather than treating the first DEC as a permanent solution. Establish the reporting period, meter coverage, access to consumption records and who is responsible for renewal. Confirm the current Action Plan and route before commissioning the work.
What energy information is needed?
Provide a complete consumption record for the relevant assessment period, supported by meter readings or supplier records. Explain shared meters, landlord and tenant supplies, changes of occupancy and fuels used. Gaps or inconsistent boundaries should be resolved before relying on the data.
What will SES deliver?
We review the instruction and energy records, identify missing information and agree the certificate and reporting scope. Advisory reporting and improvement priorities can be discussed as part of the instruction. For public estates outside Scotland, confirm the location and applicable requirements before assuming the same route applies.
What information should I send?
- Property address, use, floor area and occupancy information
- Current Action Plan, previous DEC and relevant EPC
- Fuel and electricity consumption with reporting dates
- Meter boundaries, shared supplies and evidence for any data adjustments
Send what you have through our quote form or contact us for advice.
Sources and guidance
Requirements depend on the property, proposed work and relevant dates. The sources below distinguish statutory guidance from assessment methodology; SES provides assessment services, not regulatory approval.
Ready to book your assessment?
Send the location, plans and deadline. We’ll confirm a fixed fee, and you’ll have your report within 48 hours of our visit.