Compliance & safety

Fire risk assessments

Fire risk assessments for Scottish premises, with clear findings and actions in order of priority. We agree the scope before arranging an inspection.

Turnaround
48 hours
Starting fee
From £225 + VAT
Coverage
Scotland & north of England

Starting price for standard assessments, excluding VAT. We confirm the full fee before work begins.

Theatre Royal Glasgow, a public venue where fire safety management is essential
48hrs From site visit to finished report

What you get

What’s included

  • On-site fire risk review
  • Risk rating and prioritised action schedule
  • Clear implementation guidance
  • Premises and occupancy review
  • Prioritised recommendations
  • Scottish dutyholder context

How it works

From enquiry to report in four simple steps.

  1. 01

    Tell us about the property

    Send the address, building use and any drawings or existing reports through our quote form.

  2. 02

    Fixed quote, agreed upfront

    We confirm the scope and full fee before any work begins, so there are no surprises.

  3. 03

    We visit the site

    An assessor attends at a time that suits you and gathers everything needed on the day.

  4. 04

    Report in 48 hours

    Your report is issued within 48 hours of the site visit.

Planning your assessment

Your questions, answered.

Straightforward guidance on what’s required, what we look at and what to send us.

Last reviewed against the official and technical sources listed.

Who needs a fire risk assessment in Scotland?

The Fire (Scotland) Act 2005 and Fire Safety (Scotland) Regulations 2006 set duties for most non-domestic premises, including workplaces, premises open to the public and licensed HMOs. Those responsible must assess and manage fire risks. The exact duties depend on control of the premises and their use.

Does the same law apply to every residential property?

No. Individual homes and the common areas of ordinary blocks of flats should not automatically be described as subject to the same regime as non-domestic premises. HMOs, sleeping accommodation and other relevant premises need their own scope review. Residential fire-safety work can also involve other duties and specialist assessments.

What does the assessment consider?

The review considers ignition and fuel hazards, people at risk, escape arrangements, warning systems, emergency lighting and management procedures within the agreed scope. Visible fire precautions and available maintenance records inform the findings. Intrusive inspection or specialist testing must be separately identified where needed.

What happens after the report?

The report records findings and prioritises recommended actions. The dutyholder remains responsible for managing risk, implementing appropriate measures and keeping arrangements under review. A report is not a legal guarantee or a substitute for maintenance, training and effective fire-safety management.

When should the assessment be reviewed?

Review it when significant changes affect the premises, occupants or fire precautions, or when there is reason to doubt its validity. Agree an appropriate review programme for the premises. Do not assume a universal expiry date covers every building and use.

How do I arrange a survey?

Send the address, use, occupancy, floor area and any existing assessment. Explain access restrictions and the reason for the instruction. We support enquiries in Glasgow, Edinburgh and wider Scotland, with timing confirmed against scope and availability.

What should a Glasgow business prepare before the visit?

Arrange access to the areas within the assessment scope, identify who controls shared premises and gather the previous assessment, alarm and emergency-lighting records. Tell us about sleeping accommodation, changes of use, vulnerable occupants or outstanding actions. For multi-occupancy premises, clarify landlord and tenant responsibilities before the survey.

What affects the fee and survey programme?

The fee depends on the size and use of the premises, occupancy, complexity, access and the assessment scope. The starting price above applies to straightforward assessments; we confirm the full fee for your premises before work begins. Send plans and the existing report with your enquiry so the quotation reflects the building. SES aims to issue the report within 48 hours of the inspection; confirm availability and reporting dates before instruction. An inspection date is agreed separately.

What information should I send?

  • Address, plans, building use and occupancy including vulnerable occupants
  • Previous risk assessments and outstanding actions
  • Fire-alarm, emergency-lighting and maintenance records
  • Evacuation arrangements, training records and access contacts

Send what you have through our quote form or contact us for advice.

Sources and guidance

Requirements depend on the property, proposed work and relevant dates. The sources below distinguish statutory guidance from assessment methodology; SES provides assessment services, not regulatory approval.

Ready to book your assessment?

Send the location, plans and deadline. We’ll confirm a fixed fee, and you’ll have your report within 48 hours of our visit.